Year Completed: 2016
Awards: Manufacturing Facility of the Year 2016, “Be Inspired” RIAI award
System Used: TB50 SG, Concealed Frame Vents, Glass Fins
Architect: PM Group
The multi-award winning Grifols development was built in two phases, a 240,000 sq. ft. logistics centre with a three-storey office space and a 200,000 sq. ft. biopharmaceutical process facility. Our structurally glazed curtain wall system with integrated ventilation features on the first phase of the building and connects the two building through a glazed link corridor. The external façade features integrated vertical glass fins, designed in the incorporate the blue brand of Grifols. Read more….