Skip to content

IDA Advanced Technology Building

Dundalk

The Brief

Certification: LEED CS

System Used: TB50 Structurally Glazed Curtain Wall System, TB50 Concealed Frame Awnings  

Location:  Dundalk

Client: IDA Ireland

Architect: Fewer Harrington & Partners

APA Facade Systems are delighted to see another development for IDA Ireland completed. The IDA Advanced Technology Building in Dundalk is a 33,906 sq ft (3,150 sq m), high profile technology/manufacturing space. It is situated in the IDA Dundalk Science & Technology Park, Mullagharlin.

The two-story open plan office accommodation is laid out over large rectangular floor plates. It features an impressive self-contained production/technology building with accommodation to include technology area, offices, core, plant area, toilets, welfare facilities and a spectacular reception area with a full-height glazed entrance.

IDA Advanced Technology Building Dundalk

Streamlined, Structurally Glazed Finish

Our structurally glazed TB50 curtain wall system with integrated concealed frame vents was installed on this project by Season Master Double Glazing Ltd, adding much needed natural ventilation to the internal office environment.

LEED Certified, Sustainable Office

The new Advanced Technology Building is conveniently located just 45 minutes from Dublin airport and 55 minutes from Belfast airport. It has been designed by Fewer Harrington & Partners to achieve LEED CS accreditation.

View All Case Studies

Alexion Pharmaceutical - APA Facade Systems
Richard McVey

Alexion Pharmaceutical

Alexion Pharmaceutical Dublin The Brief System Used: TB50 SG Curtain Wall & TB50 SG CFA Location:   Dublin Client:   Stewart Construction & Conack

Read More
The Roy - 1650 Granville Street - Halifax
admin@imsmarketing.ie

The Roy

The Roy Halifax, Nova Scotia, Canada The Brief System Used: TB50 Curtain Wall, ST80 Windows, ST80 Door Systems, Sliding Doors

Read More

You are visiting our US website, click the button to visit our Global site.

APA Technical Library

You are about to be brought off site